Beijing Huaifang 600,000t/d reclaimed water plant sludge treatment project

Project profile:
Raw materials and capacity: Sewage sludge, 1220 t/d (with 20% of solid content)
Biogas production: 79,200 Nm3/day
Biogas use: CHP
Purac Supply scope: anaerobic system
The technical route of this plant is
gravity concentration + sludge pretreatment + THP + anaerobic digestion +
dewatering by chamber filter pres. PURAC provides an overall process
design and system integration consulting service, and at the same time
be responsible for core equipment supply and technical services such as
commissioning and test runfor the sludge anaerobic digestion system.
This project has been running stably for many years.
The project is located at Huaifang reclaimed water Plant, the capacity
of which is 600,000 t/d. The technical route of sludge treatment in the
whole plant is that the excess sludge is pumped into the pre-dewatering
treatment system after gravity concentration,, and the primary sludge is
directly spumped into the pre-dewatering system after grit removal, and
then pretreated sludge will be pump into the THP system.
After THP treatment, the sludge is pumped into the digester, and the
digestate is dewatered by chamber filter press, the TS of sludge cake
is more than 40%.