Lindum Drammen Sludge Treatment Plant,Norway
The project receives biological sludge and
oil from different sewage treatment plants, with an annual treatment capacity
of 25,000m3 of biological sludge and 2,000m3 of oil, using
anaerobic digestion process with a 3000 cubic meter anaerobic digestion tank.
The annual dry sludge treatment capacity reaches 6,000 tons/year, generating
1.5MW of electricity. The treated sludge residue is used as fertilizer for soil
improvement, and the project was put into operation in 2012.
As the general contractor, Purac is responsible for process design, equipment supply, installation, process start-up and commissioning, as well as performance guarantee.