Beijing Gaobeidian 1,000,000t/d sewage treatment plant sludge treatment project
Project profile:
Raw materials and capacity: Sewage sludge, 1358 tons/day (with 20% of solid content)
Biogas production: 65,000 Nm3 / day
Biogas use: CHP
Purac Supply scope: anaerobic system
The project is located in the Gaobeidian WWTP, which is the largest project in Beijing with capacity of 1,000,000 t/d. The project introduced the THP technology, which uses high- temperature (155-170℃) and high-pressure steam to boil the sludge and instantaneous pressure relief to get the result of steam explosion flash evaporation, so that the cell walls of the sludge break and extracellular polymer hydrolyzes to improve the fluidity of the sludge. Through the THP, the TS of sludge into the digester can be greatly increased, while the HRT in the digester is reduced, so that the existing digester can handle more sludge, and the biogas production rate can be increased by 15% to 20% compare to conventional anaerobic treatment. The dewatering property of the digestate is also improved.